
Modular firestop filling for openings with cables, pipes and duct systems. Bricks are fitted around the penetrants and the perimeter is sealed with intumescent sealant.
| Assembly | Products | Rating | Report |
|---|---|---|---|
| 3 Hour firestop assembly | VM brick, V3J sealant, VR putty | F 3 Hr / T 3 Hr | 250731051GZC-001 |
| Metal duct through concrete wall | VC sheet, VR putty, V3J sealant, VM brick | F 4 Hr / T 4 Hr | 250731051GZC-002 |